{"id":130,"date":"2019-02-14T23:54:13","date_gmt":"2019-02-14T23:54:13","guid":{"rendered":"https:\/\/www.spsdental.co.uk\/?page_id=130"},"modified":"2024-07-31T12:40:20","modified_gmt":"2024-07-31T11:40:20","slug":"dental-surgery-design","status":"publish","type":"page","link":"https:\/\/www.spsdental.co.uk\/dental-surgery-design\/","title":{"rendered":"Dental Surgery Design"},"content":{"rendered":"
<\/p>\n
Time Scale – Typically 7-14 Days Depending on Project Type<\/strong><\/p>\n <\/p>\n The proposed layout will be submitted for your approval, any alterations to the plans can be discussed and adjusted accordingly.<\/p>\n Once the layout plan has been approved, we can introduce you to a trusted build team to provide an estimate for the enablement works.\u00a0 Alternatively we can work with your own trusted build team.<\/p>\n Colour samples for the dental chair upholstery and cabinetry samples will be brought to site so you can make an informed decision on what you require for your new space.<\/p>\n Once you have confirmed your order, signed off the layout proposal, drawings will include plumbing, electrical and data service requirements for the products being supplied and installed by SPS Dental.<\/p>\n <\/p>\n Time Scale – 7 Days<\/strong><\/p>\n <\/p>\n Your installation will be carried out based on the schedule of works by our fully accredited team of engineers.\u00a0 \u00a0We are always on hand to answer any questions prior to the dental equipment being fitted.<\/p>\n <\/p>\n Time Scale – Project Specific<\/strong><\/p>\n <\/p>\nStage 2 – Project Specifics<\/span><\/h4>\n
Stage 3 – Colours, fabric & materials<\/span><\/h4>\n
\n
Stage 4 – Detailed Drawings<\/span><\/h4>\n
\n
Stage 5 – Project Goes Live – Installation<\/span><\/h4>\n
Stage 6 – Project Handover & Training<\/span><\/h4>\n
\n